Access Control Point Building and Canopy (ACP & Canopy) Tooele Army Depot Tooele, Utah
This $477,436.00 dollar project, involved removing the old Access Control Point (A.C.P.) Building and Construction of a new A.C.P. with Canopy at the Tooele Army Depot, Tooele, Utah. Project requirements included site preparation with minimal disruption to traffic flow on a main entrance to the Army Depot. Northern Construction run new under ground wiring, new water lines and a new sewer line that tied into the existing. Northern Construction placed new concrete flooring, concrete walls with bullet proof windows and installed cabinets counters, restroom HVAC Lighting, smoke detectors and infrared heat panels. Finishing the project with new asphalt curbing, lane markings and signage.
Shotgun Springs Wetland Restoration Project, 17 miles West of Corrine Utah
This $1.3 million dollar project contracted with USDA/NRCS Utah State office. Northern Construction excavated eroded areas and transported to basins that supported sediment control. Areas deeper than specified were then filled. A final grading was done to help with drainage. Northern Construction reconstructed all of the roads as well as repaired one eroded dike and built seven new dikes. Seeding was then performed over the disturbed areas. (Ariel Shots Below)
Building 519 Tooele Army Depot Design Build, Tooele, Utah
This $3.3 million dollar project contracted with the General Service Administration (GSA) out of the Denver Colorado Office. Northern Construction structurally rebuilt building 519. By removing the existing roof, framing and concrete floor. A new pre-engineered metal building was constructed in its place on a new foundation with new interior design. Northern Construction constructed a new design build Administration building as well. Other improvements consisted of site development, new electrical, new fire suppression system and relocation all of the shop equipment. The HVAC system was completely re-done through out the shop area. With a thermal efficiency system.
Design Build Tooele
Army Depot Building 520
The contract requirements included to structurally rebuild
building 520. This consisted of the demolition of the existing roof, framing
and concrete flooring. A new pre-engineered metal building t be constructed in
its place on a new foundation with new interior design. A new administration
area will be added. Along with new restrooms in the south end of the building
as part of the new administration space. Other improvements consisted of site
development new parking lot, new electrical, new fire suppression system and
relocating all equipment in the shop area.
New Administration Building |
Shop Area in Progress |
Completed Shop Area |
Administration Building Interior |
Station Park Hyatt Hotel
Northern Construction performed as a Mechanical subcontractor on this project. The contract requirements included installing all wet side mechanical/plumbing in the new construction of the Hyatt Hotel. This included rough installation and all finish installation.
Florissant Fossil Beds National Monument HVAC Repair & Nelson House Demolition
This project consisted of multiple repairs to improve the functionality of the visitor center's sate of the art heating and ventilation system,
Demolition and removal of the Nelson house completes a square footage trade off the park committed to prior, by removing an unsafe, unused structure from park land.
Hill AFB Fire Crash Rescue Facility