- 236220 (Primary) - Commercial and Institutional Business
- 236210 - Industrial Building Construction
- 238220 - Plumbing, Heating, and Air Conditioning Contractors
- 238290 - Other Building Equipment Contractors
- 238350 - Finish Carpentry Contractors
- 238390 - Other Building Finishing Contractors
- 238910 - Site Preparation Contractors
- 238990 - All Other Specialty Trade Contractors
- 561730 - Landscaping Services
- 561790 - Other Services to Buildings and Dwellings
- 811310 - Commercial and Industrial Machinery and Equipment
Fire Crash Rescue Facility Hill AFB, Utah
The $14.3 million dollar Design Build Fire Crash Rescue Facility at Hill AFB consisted of a singe story 7,740 Square foot Fire Station containing three apparatus bays and supporting functions. In addition to the three primary fire fighting vehicle parking bays. This project included equipment storage, a change area, living/sleeping quarters, a laundry room, a day room, restrooms, a mechanical/electrical - support room, computer test lab and a physical fitness facility. Northern Construction facilitated 90% design review meeting prior to the final construction document review, followed by 100% design-submittal approval prior to construction. As built drawings were provided by the contractor at completion prior to acceptance. Northern Employed a Quality Control System Manager (Q.C.M.) and Site Safety Health Officer (S.S.H.O.). The Q.C.M. and S.S.H.O., implemented government required quality control and safety testing programs,
Clearfield Job Corps Renovation, Clearfield Job Corps, Clearfield, Utah
The $1.3 million dollar Clearfield Job Corps Renovation project consisted of several renovation projects and repairs. The scope of work for this project included, among other things, the following:
Northern Construction self-performed all electrical work on this project, to include installation of a new distribution panel and new panel board. The new panels' capacity was installed to accommodate the existing electrical loads and additional 25% spare capacity for future growth. We reused the existing feeders as much as code would allow, and reconnected existing branch circuit wiring.
- Removing a damaged downspout and installing new metal downspouts and a new metal gutter.
- Cleaning rust from the metal siding and applying low VOC rustproof paint to the bottom; re-grading the area adjacent to the wall and installing a wide gravel bed in this strip for drainage wall protection.
- Cleaning rust from structural steel members and applying rust inhibiting prime coat and two coats of rust inhibiting low VOC paint to prevent future damage.
- Replacing the prior inefficient lighting in the gymnasium with high output fixtures with circular reflectors for the gym area. In addition to energy efficiency, these fixtures are heavy duty and resistant to damage or dislodgement by gymnasium activities.
- Repairing damaged concrete by removing all loose concrete in the affected areas and cleaning the surfaces. We applied high strength concrete patching compound to the damaged areas to restore the concrete to the original step profiles. We also installed air compressors, including electrical and plumbing, and ran airlines.
- Rotomilling new asphalt to a depth of 2" throughout the entire campus. We tacked and overlaid the new asphalt throughout the entire campus according to customer requirements.
Shotgun Springs Restoration, Corrine, Utah
The USDA/NRCS Utah office awarded this $1.3 million dollar project to Northern Construction.
- This project consisted of performing work to control soil erosion, by placing approximately 40,000 yards of earth fill, 10,000 linear feet of gravel road, five (5) water control structures, installation of approximately 1600 feet of pipeline, seeding for rehabilitation, as well as additional apprentices
- Excavated eroded areas transported to basins that supported sediment control such as straw bale filters, or Geo-textile fences.
- A final grading was done to help with the drainage.
Northern Construction controlled petroleum, dust and smoke from becoming air and/or water pollutants through out the complete project.
- Seeding was then performed to as per Government specifications to protect from future erosion.
Grounds Maintenance @ Dyess, Texas AFB
Northern Construction is currently performing the grounds maintenance services at Dyess Air Force Base. This is a $500,000.00 dollar 3 year contract that requires Northern Construction to maintain the grounds and airfield mowing to keep the base looking pristine. This contract illustrates our firms ability to meet the requirements of the Service Contract Act and to provide routine services in a professional and successful manner.309th Maintenance IDIQ, Hill AFB, Utah
This contract includes maintenance on all equipment and machinery with the 309th Wing (309MXW) facilities at Hill AFB, Eagle Range (UTTR), and Little Mountain. Additionally on rare occasions the contractor may be given a task order of tenant organization of OO-ALC and 75 ABW. Each task order will identify the location of the project; and will note if located inside a high potential foreign object area. This contract has a value of $51 million dollars and is a five year contract. To date Northern Construction has been awarded eight task orders ranging in value form $18,000.00 to $100,000.00.Awning for Hush House
Emergency Response
Rectifiers Building 505
Water Brake Repair
Emergency on Call
Kahn Water Brake Repair
Crane Modification
Oil Purge Distiller
SATOC Design Build at Fort Carson, Colorado
The first task order awarded to Northern Construction on the contract is a Design Build UV/Evacuator system for the Iron Horse gym. This Ultra Violet system is for supplemental sanitation and disinfection along with an evacuator system to controal Natatorium air quality. This task order has a value of $793,000.00 dollars and was ordered by the Army Corps of Engineers (USACE).
Tooele Army Depot IDIQ, Tooele, Utah
Northern Construction has been awarded five task orders under this IDIQ contract, ranging in value from $19,000.00,to $58,000.00.
Lighting Upgrade
Weather Stripping on Igloo Doors
Upgrading and Access Road
Apron Upgrades
Upgrade Staging Area
Igloo Aprons
ACP and Canopy
Utah Air National Guard IDIQ MATOC
Northern Construction was awarded a IDIQ MATOC with the Utah National Guard with a base award period of two calendar years and three one year options.
Replace Heating Coil
Replace Exhaust Fan
Design Build IDIQ MATOC USACE
This contract award has a base period of three years and two year option.
Design Build Tooele Army Depot Building 519, Tooele, Utah
This project consists of remodeling the existing Building 519 designing and constructing a new Administration building adjacent to building 519. Other improvements will be the site development upgrade the electrical, HVAC, fire suppression, an overhead rail system, and relocating existing equipment. This contract has a value of $3.3 Million dollars.
Design Build Tooele
Army Depot Building 520
This project required Northern Construction to structurally rebuild building 520. This consisted of the
demolition of the existing roof, framing and concrete flooring. A new
pre-engineered metal building t be constructed in its place on a new foundation
with new interior design. A new administration area will be added. Along with
new restrooms in the south end of the building as part of the new
administration space. Other improvements consisted of site development new
parking lot, new electrical, new fire suppression system and relocating all
equipment in the shop area.
National Institute of Standards and Technology Roof Repair
This project is located in Boulder Colorado and consists or repairing various roofs at the National Institute of Standards and Technology facility. Contract value for this project is $1.6 Million dollars.
Florissant Fossil Beds National Monument Visitor Center HVAC and Nelson House Demolition.
This project is located at the Florissant National Monument in Florissant Colorado with the National Park Service. This project consists of multiple repairs to improve the functionality of the visitor center's state of the art heating and ventilation system, making occupants comfortable and the system reliable.
The demolition and removal of the Nelson completes a square footage trade of the park committed to prior to visitor center construction by removing an unsafe, unused structure from park land.
Contract value for this project is $458,670.00
Northern Construction has completed smaller projects with the USDA office in Logan Utah.
HVAC Duct work Modifications
Head House Renovation
Bee Lab Renovation
Northern Construction continues to grow in both Utah and Colorado. Our current projects are:
Standard Air Munitions Package (STAMP) Hill AFB, UT $10.2 million
Completion Date: Feb. 2020
F-35 Munitions Maintenance Complex Hill AFB, UT $9 million
Still in Design Phase
National Institute of Standards and Technology (NIST) Design Build Fitness Facility Relocation
Boulder CO. $980,000.00
Completion Date: Nov. 2019
NIST MACC 5 year contract, NIST Roof Drain Maintenance and Repair 5 year Contract
Job Order Contract with the State of Utah 4 year contract
GSA single award IDIQ for Region 8 (Utah and Colorado) 5 year contract
Northern Construction continues to grow in both Utah and Colorado. Our current projects are:
Standard Air Munitions Package (STAMP) Hill AFB, UT $10.2 million
Completion Date: Feb. 2020
F-35 Munitions Maintenance Complex Hill AFB, UT $9 million
Still in Design Phase
National Institute of Standards and Technology (NIST) Design Build Fitness Facility Relocation
Boulder CO. $980,000.00
Completion Date: Nov. 2019
NIST MACC 5 year contract, NIST Roof Drain Maintenance and Repair 5 year Contract
Job Order Contract with the State of Utah 4 year contract
GSA single award IDIQ for Region 8 (Utah and Colorado) 5 year contract